Our teams have extensive experience in telecoms network connectivity, cable and duct installation, including major fibre optic network installation and we can even install fibre optic pilot/control systems for monitoring, protection and control of power circuits.
Other Services
Our compliance experts can help you to get the most from available schemes within our suite of utility-related compliance services.
Underground Map
When a site is in design, or you are about to set up your site office for a new project, it is always crucial to know where the existing utility infrastructure lies. We can procure infrastructure plans identifying which underground services are in the location of your works, whether this is used for diversions, disconnections or to locate the nearest point of connection for your development.
Temporary Builders Supply
Maximeyes can assist in organising temporary building supplies for any utility. Temporary supplies are often needed in the early stages of a development project to comply with work-safe regulations and to ensure builders and other trades people have the utilities they need to progress the works before a permanent connection is made. We can also make the necessary arrangements to ensure the temporary building supply becomes part of the permanent connection when required or alternatively to remove the TBS where it is no longer necessary. Our personal, hands on service will help you to achieve the most effective route to completion.
Disconnections
When redeveloping an existing site there is often a need to organise gas and electric meter removals and supply disconnections to allow site works to proceed safely. We offer assistance in organising and coordinating all disconnections and meter removals to ensure the site is safe and ready for demolition work. Our unbiased and persistent focus on our clients’ interests often results in considerable cost savings, reduced overheads and shorter project time frames. We are aware that organising disconnections is often one of the lengthiest elements of the process and may cause unnecessary delays to the project schedule if done incorrectly. We have the experience to get things right first time and can assist in obtaining a plant provision for gas and electricity that will allow your project manager to identify which supplies may need to be disconnected. Once the details are provided to us, we will obtain the necessary quotations and coordinate with all parties involved to complete the meter and supply disconnections in a timely manner. The standard lead times for disconnections are between 15-20 working days for gas and 20–40 days for electricity so it should always be taken into consideration early when planning the on-site building and demolition works. Upon completion, we will ensure the necessary site clear certification is issued to allow the project to progress without delay.
Alterations
When taking over a new development, it may be necessary to increase or decrease the capacity available from the networks in order to provide the most efficient, cost-effective set up for your project. We can assist on all required alterations! Whether you need to move an existing supply, reinforce the network or downgrade your metering set up, we will be on hand to ensure efficient delivery, minimising disruption and cost.
Diversions
In order to facilitate your project, it may be necessary to divert existing services to allow your design concepts to become a reality. Diverting existing utilities can often become a costly process and therefore any savings achieved on this aspect goes straight on the bottom line. Starting off with the right information at an early stage is often critical to how much you pay for the works, when the works are carried out and the impact of this on your proposals. At energeyes, we can coordinate everything for you, providing valuable, cost saving advice while taking the strain of the whole process off your hands.
I think you are a great company. Honestly on a day to day basis and being in the profession for so many years I just cannot help but to admire you. As they say you are as good as your team or your manager. I was very stressed about the issue with MA and Kyle’s assistance was a great relief and appreciated.FINANCIAL CONTROLLER, 4C HOTELS LTD
Why choose us
We remove the stress and complexity of dealing directly with the utility networks, delivering a first class customer experience while saving you both time and money. We provide a full end-to-end service, helping you to keep your project on track from inception right through to completion.
Experienced Team
Our team has experience across global projects including Rio de Janeiro Airport, NHS Trusts, Kings College London and The London Science Museum and more.
Improve Performance
Increase your awareness of energy efficiency and the actions required to improve this across your business.
Free Preliminary Audit
Our experienced team will undertake an initial site survey and analysis of your current consumption data before advising you on the best options.