• Menu
  • Skip to right header navigation
  • Skip to main content
  • Skip to primary sidebar
  • Skip to footer

Maximeyes

Business Utilities Simplified

  • Home
  • Solutions
    • Procurement
      • Energy
      • Water Supply
      • Telecoms
      • Business Waste
      • Bureau Solutions
    • Optimisation
      • Energy Compliance
      • Energy Optimisation
      • Energy Efficiency
      • Energy Solutions Funding
      • Products
    • Connectivity
      • Gas Connectivity
      • Electricity Connectivity
      • Telecoms Connectivity
      • Utility Meters
      • Multi Utilities
      • Other Services
  • Sectors
    • Care Homes
    • Hotels
    • Restaurants
    • Manufacturing
    • Other Sectors
  • Why us
    • About us
    • Leadership Team
    • Fuel the Change
  • Case Studies
  • Blog
  • Contact
  • Free Audit
  • Home
  • Solutions
    • Procurement
      • Energy
      • Water Supply
      • Telecoms
      • Business Waste
      • Bureau Solutions
    • Optimisation
      • Energy Compliance
      • Energy Optimisation
      • Energy Efficiency
      • Energy Solutions Funding
      • Products
    • Connectivity
      • Gas Connectivity
      • Electricity Connectivity
      • Telecoms Connectivity
      • Utility Meters
      • Multi Utilities
      • Other Services
  • Sectors
    • Care Homes
    • Hotels
    • Restaurants
    • Manufacturing
    • Other Sectors
  • Why us
    • About us
    • Leadership Team
    • Fuel the Change
  • Case Studies
  • Blog
  • Contact
  • Free Audit

Mobile Menu

020 8652 7525

Greenwich Promenade LLP

New elec connection at the Cutty Sark on Greenwich Promenade, including meter installation and supply contract.

Net benefit significant time and cost saving: approx. 4-6 weeks and £20,000.

February 17, 2021 //  by s7ivp

New elec connection at the Cutty Sark on Greenwich Promenade, including meter installation and supply contract.

Details:
In 2006 the Cutty Sark was closed to the public for the Conservation Project. A new electrical connection was required to facilitate a load of over 1000KVA, supplying the ship as well as the nearby promenade.

The client approached maximeyeseyes in March 2011 with an incomplete £400k quotation received from the local DNO. Project completion was scheduled for Spring 2012 in order to be ready for the London Olympics. There were number of local authorities’ regulations that had to be accommodated and all street works planned within strict time frames.

Action Taken: maximeyeseyes appointed various independent contractors to participate in the tender for a new 1064KVA connection and meter installations for several supply points. After a couple of site visits offers were submitted within 25 working days. The most competitive quotation showed a saving of over £80,000 compared to the offer from the DNO and also offered a staggered payment option and faster completion time.

Net Benefit: A cost reduction of over £80,000
3 phase payment schedule: 25% payable upon acceptance, 50% at the construction phase and 25% prior to energisation
Energisation completed within 16 weeks, meeting the strict timeframes imposed by the local authorities.
maximeyes managed the installation of electric meters, including the provision of competitive supply contracts.

Category: Case Studies

Previous Post: « Tune Hotels
Next Post: Splendid Hotel Group »

Footer Widget Header

Reduce your costs and save time with simple solutions for business utilities

Get your free no-obligation audit today

Get a free audit Contact us

Footer

Head office

56 - 58 High Street
Sutton
Surrey
SM1 1EZ

Contact us

020 8652 7525
enquiries@maximeyes.me

Useful links

  • Blog
  • Contact
  • Privacy Policy
  • Complaints Procedure

Follow us

Copyright © 2023 · Maximeyes
Privacy Policy